Turning off water supplies
Connecting the pipes
Preparing for installation
Apply sealant tape (G) on all threads. Connect
water supply tubes to the valve body (J). For
welding connection, remove inammable
parts prior to soldering.
Attach the vertical shower pipe and elbow to
the valve body (J).
Attach the vertical spout pipe and elbow to the
valve body (J).
For shower only installation, install the plug (K)
included onto the bottom unused port.
Note the installation distance between the shower
arm (B), handle (E), and spout (F).
Shut off main water supply before installation.
Fiberglass wall: Position the valve body (J) so
that the face of the plaster guard (H) will be ush
against the back of the berglass wall.
Drywall or drywall with tile: Position the valve
body (J) so that the face of the plaster guard (H)
will be ush with the face of the nished wall.
Installation
1
3
2
K
J
B
E
F
49 3/16 in.
(1250 mm)
1 15/16 in.
(50 mm)
1 13/16~2 5/16 in.
5 13/16 in.
(148 mm)
Plaster guard
Plaster guard
Finish wall Dry wall
6 in.
(152 mm)
G
5
HOMEDEPOT.com
Please contact 1-855-434-5224 for further assistance.
Print in english
Looking to buy parts